43221 Queen Elizabeth Sixth Form College

43221 Queen Elizabeth Sixth Form College

Friday, 20 January 2012

Shooting Schedule

Shooting/Recording Schedule


Production Name:       Behind the Quiff: Five Years of Amateur Film Making

Schedule sheet Number: 1

Shooting/recording Deadline: 20.02.2012


Material/shots to record*
Date of proposed recording
Location
Personnel and equipment needed (lighting, microphones, cameras and props)
White Background presenting shots
25.01.2012


The Studio
Camera Operator (1 or 2), Two Cameras (One Main + One Behind the Scenes),

Additional lighting

Props:
  • Tripod
  • Cameras
  • Mobile Phone
  • Laptop

‘Pre-Production’ Scene
23.01.2012
Bedroom - Computer
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras
  • Computer

‘Production’ Scene
24.01.2012
Exterior – Art Centre

Interior - Loft
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras
  • Production props

‘Post Production’ Scene
26.01.2012
Bedroom - Computer
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras
  • Computer

Additional shots for 23rd, 24th ,26th
27.01.2012
Loft
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras
  • Computer

‘Sharing’ Scene
30.01.2012
Bedroom - Computer
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras

Filming a production of a production
13.02.2012 to 17.02.2012
Loft

Exterior building
Two Cameras (One Main + One Behind the Scenes),

Props:
  • Tripod
  • Cameras
  • Production props

‘Sharing’ Additional shots
18.02.2012 to 19.02.2012
Birmingham
Props:
  • Tripod
  • Cameras



No comments:

Post a Comment